Quote and deposit app for bathroom fittersA bathroom quote that looks as good as the bathroom will.
Say the job and the price. Tools Down makes the quote she accepts in one tap, the deposit that books your slot, and the balance from the same job. The extras go on the record the day you agree them.
You: Quote Sarah’s bathroom, £8,250. Full refit. She’s supplying the tiles and the mirror.
Tools Down: Done. £8,250 for Sarah’s bathroom. Send it?
Quote · Q-0318Ready to check
Bathroom refit
Sarah Hughes
Strip out, first fix, boarding and tanking
Tiling, second fix and making good
Tiles and mirror supplied by the customer
Total£8,250
Valid for 30 days
Accept online in one tap
Then “ask Sarah for 25% to book” makes the deposit invoice from the same job.
Heard on the forums
I hate it when you spend a couple of hrs doing a quote and never hear back from people. The guy that taught me keeps saying I should chase the people up. I am just not that kind of person though.
Ask for the deposit by chat when she accepts. When the job’s done, the invoice comes from the same job with the deposit taken off, and it’s chased at 3, 7 and 14 days if it isn’t paid. One tap pauses it.
Money on this jobExample
Sarah’s bathroom
Quoted £8,250
Deposit to book, 25%Paid
£2,062.50
Balance, with the deposit taken offNext
£6,187.50
What matters on your jobs
What it does on a bathroom job
The quote she says yes to
You say: Quote Sarah’s bathroom, £8,250. She’s supplying the tiles.
A quote page she accepts in one tap, valid for 30 days. Bathroom quotes get compared; if hers goes quiet for a week, it shows up in your morning brief with a Follow up button, so you don’t have to decide whether to chase.
Extras on the record the day they’re agreed
You say: Sarah’s job: moving the radiator, £180, agreed today.
Saved on the job at that price, the day it’s agreed, so it reaches the final invoice and there’s a record when the balance is queried.
Photos of what the tiles will hide
You say: Show me the tanking at Sarah’s.
Tanking, pipework, the floor before the boards go down: filed on the job as you take them, found again by asking when a leak or a snag is disputed.
A bathroom, start to finish
The quote, with the tiles noted as hers.
Accepted in one tap; the deposit invoice books your slot.
First fix: photos of the pipework and tanking.
The radiator move, agreed and saved at £180.
The balance invoice at the end, with the deposit taken off.
The honest fit
What it doesn’t do yet
No design tool, 3D planner, measured drawings or supplier ordering.
No team or subcontractor scheduling: the electrician and the plasterer aren’t users.
It doesn’t produce the cancellation notice for you, or notify building control or the water company.
No card payments or finance: customers pay by bank transfer from the invoice page. Citizens Advice suggests paying by card where possible, so some customers may ask.
Price and the free plan
Made for bathroom fitters working on their own.
Free to start. One price if you need more.
Your first month is free, with no card.
After that, 50 messages a month to Tools Down stay free for good.
Every screen works on the free plan: quotes, invoices, chasing, reminders, the customer’s pay page, gas safety records and export.
Tools Down Pro is £29.99 a month including VAT, through Apple. It lifts the message limit and nothing else, and the price you join at is the price you keep.
Tools Down’s ceiling is 2,000 jobs a month on every plan, so there’s no allowance to watch. A weekly fair-use limit on messages applies on every plan.
Coming soon to iPhone.
Be first to hear when Tools Down is ready for your iPhone.
We’ll only email you about early access. No spam.
Straight answers
Questions bathroom fitters ask
Can I take a deposit and stage payments for a bathroom?
Yes to a deposit: ask for it by chat, as a percentage or an amount, and the final invoice takes it off. Every invoice you raise is chased the same way.
Can a customer cancel after agreeing a bathroom at home?
Usually, within 14 days of agreeing it, because it’s an off-premises contract. If they asked you to start inside the 14 days and then cancel, they pay a proportionate amount (reg 36). If they weren’t told about the right to cancel, the period can run up to 12 months longer (reg 31).
Does a bathroom refit need building regulations approval?
Replacing baths, toilets, basins and sinks doesn’t; a new bathroom involving plumbing, or electrics near the bath or shower, may (GOV.UK: building regulations approval). Members of APHC, BESCA, Certsure, HETAS and NAPIT can self-certify.
How do I prove what’s behind the tiles?
Take photos as you go. Tools Down files them on the job, and you can ask for them later: “show me the tanking at Sarah’s.”
Do I need to tell the water company about a new bath?
Information, not advice. Open a rule to read it, with its source; check the source for your own job.
The quote agreed at the kitchen tableUK
A job agreed in the customer’s home is an off-premises contract: 14 days to cancel from the day it’s agreed, and up to 12 months more if they weren’t told about the right. Work can start inside the 14 days only at their express request on a durable medium; if they then cancel, they pay a proportionate amount.
When a bathroom needs building controlEngland and Wales
Installing a bathroom that involves plumbing, or changing electrics near a bath or shower, may need approval. Replacing baths, toilets, basins and sinks doesn’t.
Big baths: tell the water companyEngland and Wales
Notice and consent are needed before installing a bath of more than 230 litres, a bidet with an ascending spray or flexible hose, or a pump drawing more than 12 litres a minute.